Before Repair After Repair
|
|
|
Project Type: Suspension pedestrian bridge
Location: McDowell, VA
Span: 128' feet
Completed: April 2023
Description:
This 128' suspension bridge was for the Conservation Fund. Turning the land over from the Conservation Fund to the park service required repair of the bridge.
|
|
|
|
JZ Engineering
|
Office Address: 794 N. Main Street
Mailing Address: 1293 Greystone Street Harrisonburg, VA 22802 |